Reducing Energy in Fans
The aim of the specialty assignment is mainly to study at Pre Heater Kiln and Calciner circuit and Fans by carrying out measurements; take inference from the present operating conditions of the plant, and establish the strategic requirements to fulfill the objectives primarily focusing on Energy Savings.
The main objective has been summarized through
- Performance study & opportunity appraisal
- Application methodology
- Implementation Sequence
- Plan overview
- Extract key elements and
- Predictive with Pay back analysis
Other services
Vibration Analysis
Diagnostic studies that measure displacement, velocity and frequency to pinpoint defects.
In Situ Dynamic Balancing
On-site balancing of fans and rotors, removing the most common cause of vibration.
Condition Based Maintenance
Predictive programmes that raise the reliability and availability of critical equipment.
Speciality Services
Arresting false air, HT fan power, cooler and kiln power optimisation.
Expert Services
Operation optimisation for 1200 to 3800 TPD plants, vertical roller mills and coal mills.
In-House Seminars
Predictive maintenance training for top and middle management.
Hearing a noise you can't explain?
Tell us about the machine. Our engineers will call you back with next steps.